(Click each project to access county updates)

​Snyder Road (proposed additional segment)
Important Update: 

Proposed segment from Bear Canyon to Placita del Sol recommended for road repair by DOT staff.  Funding for this segment is available due to cost savings from lower bid estimates received on the approved Arterial/Collector Roads-Phase I (see above).  If approved, the addition of this road segment will complete all of the collector classified portions of Snyder west of Soldiers Trail.Swan Road and Sunrise Drive

  • Micro seal treatment from Craycroft Road to Campbell Avenue
  • Hours of operation from 6 am to 5 pm.  Temporary striping to follow work.

Cortaro Farms Road:  Camino de Oeste to Thornydale

  • Plans to widen the existing roadway from 2 to 4 lanes, curbed median, storm drain system, cross drainage structures, retaining walls, public art, rubberized asphalt, traffic signal, native re-vegetation landscaping and signage and pavement markings.

Ina Road Sidewalks:  Shannon Road to La Cholla Blvd.

  • Addition of sidewalk for one mile on the North and South side of Ina Road from just East of Shannon Road to just West of La Cholla Blvd.
  • Additional improvements include addition of curb access ramps, driveway and cross-street adjustments, signal push button modifications, signing, pavement marking, tree re-establishment and slope stabilization.

Arterial/Collector (District 1) Roads - Phase I

  • Hacienda Del Sol:  From River to Sunrise (Mill/Fill)
  • Pontatoc:  From River to Sunrise (Mill/Fill)
  • Oracle Janes Station:  From Mona Lisa to San Joaquin (Mill/Fill)
  • Snyder:  From Placita del Sol to Avenida De La Colina (Mill/Fill)
  • Ina:  From Pima Canyon to Campbell (Mill/Fill)
  • Territory:  From Craycroft to Grey Mountain Trail) (Mill/Fill)
  • Magee:  From 1st Avenue to End-of-Road (Mill/Fill) 

Thornydale Road

  • $1.57 million contract approved to S. Arizona Paving (SAP) to mill existing surface and replace with new asphalt overlay between Cortaro Farms Road and Camino del Norte
  • Paved shoulders on existing three-land roadway configuration from Cortaro Farms Road to Pecos Way
  • Two-way left turn from Cortaro Farms Road to north of Pecos Way
  • ADA ramp improvements at intersecitons and pavement markings included
  • Project to begin early August 2018 with expected completion by late fall 2018
  • Funding source:  HURF and 1997 HURF Bonds

Thornydale and Linda Vista:  Problem reported with left turns

  • Ongoing construction in the area require temporary left turn restriction onto Linda Vista from Thornydale between 9 am and 4 pm.
  • Left turn restrictions removed at 4 pm to accommodate rush hour traffic

Get the Latest Road Repair Notices & Alerts (click on each link for updates)

Thank you District 1 constituents!  With your continued support and valuable feedback, we have been able to make some headway in getting road repairs scheduled and, in many cases, completed for District 1 residents.  This section of my website will focus on providing you updated information regarding District 1 road repairs.  Please continue to contact my office to report needed road repairs either by:

  • Email:  District1@pima.gov
  • Telephone:  (520) 724-2738
  • Website:  fill out the CONTACT US form and a message will be sent to my office

Good news!  The estimates for Phase I and II of arterial/collector road improvements came in $1.2 million under budget.  That allows a number of potential road improvement projects to potentially "move up" the road improvement schedule including:

  • Snyder Road:  From Bear Canyon to Placita del Sol
  • Pantano:  From Fort Lowell to Cloud

If approved, these improvements would represent an additional est. $41,221 going toward District 1 roads.

Access county documents discussing plans for arterial and collector road improvements:

​​

Have questions or County related concerns? 
Call (520) 724-2738 
Email district1@pima.gov